More description of this project available with innovation team is:
Armoring was bottle neck in November month while stranding machine have more space. While brainstorming on de-bottlenecking Armoring process the was an idea to use Stranding machine for Armoring process. There was no flexibility in Stranding machine to make Armoring process. Armoring was bottle neck in November month while stranding machine have more space.While brainstorming on de-bottlenecking Armoring process the was an idea to use Stranding machine for Armoring process. There was no flexibility in Stranding machine to make Armoring process
•Armoring Job that planned to run requires 43 wires whereas the stranding machine can have maximum 30 bobbins at single cage
ØTo overcome this issue we draw dual wire in single bobbin and fulfil the 43 wires requirement within 30 bobbins and loaded to cage 30 on stranding machine
Ø
•We have only lay plate for maximum 30 wires in stranding machine
ØWith the support of our maintenance team 43 wire lay plate was fabricated and fixed on the stranding machine in place of 30 wires lay plate
Ø
•There was no pay-off supplied along with stranding machine to load 2.6 m drums
Ø With the support of maintenance team one portable pay-off from other machine shifted to stranding machines and connected
Read Case Study